Vol. 10 · pages 301–305
As Member of the Governor-General's Executive Council, 1942–46
This text was extracted automatically from the official PDF of Dr. Babasaheb Ambedkar: Writings and Speeches, so it may contain small errors. Always check the original page before quoting.
PDF page 301
50
* Multi-purpose Development of
Damodar Valley
Labour Member’s Speech at Calcutta Conference
“ The project (harnessing the waters of the Damodar River)
is a welcome one to the Government of India. It very clearly
shows a fine prospect of the control of the River, a prospect of
controlling floods, of securing a fine area for perennial irrigation
with resultant insurance against famine and a much needed
supply of power. I am sure it will be more than welcome to
the Governments of Bengal and Bihar if they realise what the
project will mean to them and their people.”
Thus observed the Hon’ble Dr. B. R. Ambedkar, Labour
Member, Government of India, in his address to representatives
of Bengal and Bihar Governments at a Conference held in
Calcutta on August 23 to discuss the Preliminary Memorandum
on the Damodar Valley Multipurpose Project. The session
lasted two days, and the Labour Member presided.
Here is the full text of Dr. Ambedkar’s speech :
“We are now meeting for the second lime to discuss the
project for harnessing the waters of the Damodar River. As
you will recall, our first meeting in this connection took place
on January 3, 1945. We then considered the Report of the
Damodar River Flood Enquiry Committee-appointed by the
Government of Bengal in 1944.
“The issue before us was whether we should be content
with damming the river for the purpose of stopping the flood
only or whether we should make it a multi-purpose project so
as to cover generation of electricity and the supply of water
for irrigation and navigation also. The consensus of opinion
at that Conference was that we should go in for the latter.
Accordingly, the Conference decided to take the next step,
namely to create machinery for collecting the necessary data to
* Indian Information, October 1, 1945, pp. 345-49.
PDF page 302
285
MULTI-PURPOSE DEVELOPMENT OF DAMODAR VALLEY
draw up a multi-purpose scheme. On the part of the Government
of India, I offered the fullest assistance of technical experts in
carrying out this preliminary work.
“The experts have now drawn up, with the co-operation of
the engineers from Bengal, a Preliminary Memorandum on the
Unified Development of the Damodar River Valley. Copies of this
Memorandum have already been in the hands of the Government
of Bengal and Bihar.
“With regard to this Memorandum, I feel it my duty to say,
and I am sure in this I am voicing your sentiments, that we
are grateful to Mr. Voorduin for the preparation of this draft
Memorandum and also to the ready co-operation which was offered
to him by the engineering staff of the Bengal Government. Mr.
Matthews, the Chairman of the Central Power Technical Board,
has also given us the benefit of his advice, and at a later stage,
I have no doubt, that we shall receive all the assistance from
Mr. Khosla, the Chairman of the Waterways and Navigation
Board.
“For the present we have before us now a very clear, a very
comprehensive and a very essential survey of the full possibilities
of the Damodar River Valley, accompanied by adeqauate data to
enable us to take the next step with confidence.
“The reason why we have met today is to consider this
Preliminary Memorandum and the points that arise out of it.
These points are set in the agenda which is prepared for this
meeting. The agenda contains a full list of matters arising out
of the Preliminary Memorandum and which require immediate
attention. As it has already been circulated to the Governments
of Bengal and Bihar, it is unnecessary for me to go over it
again. I shall, therefore, content myself with making two general
observations (1) with regard to matters of policy, and (2) with
regard to questions of method and procedure.
“Flood control is a matter of policy. I hope that there will be
general agreement as to the desirability of providing that measure
of flood protection as will ensure full safety to the vulnerable area
of the Damodar Basin against even the most adverse combination
of foreseeable natural circumstances. I am glad to say that the
scheme drawn up in the Preliminary Memorandum does provide
for that full measure of safety.
PDF page 303 (printed page 286)
286 DR. BABASAHEB AMBEDKAR : WRITINGS AND SPEECHES
“The second matter of policy is the collective responsibility of
the three Governments assembled here to put their shoulders to the
task. I believe that there will be general agreement that the findings
in the Preliminary Memorandum justify the three Governments
in proceeding energetically with the development of the Damodar
River Valley on the general lines indicated in the Memorandum.
“The project is a welcome one to the Government of India. It
very clearly shows a fine prospect of the control of the river, a
prospect of controlling Hoods, of securing a fine area for perennial
irrigation with resultant insurance against famine and a much
needed supply of power. I am sure it will be more than welcome
to the Governments of Bengal and Bihar, if they realise what the
project will mean to them and their people.
“In concrete terms, the project will give them (1) an aggregate
controlled reservoir capacity of about 4,700,000 acre-feed,
(2) sufficient water for perennial irrigation of about 760,000
acres besides water for navigation purposes, (3) electrical energy
amounting to 300,000 kilowatts, and (4) it would serve to promote
directly the welfare of 5 million people and indirectly of many
more millions.
“Coming now to the question of methods and procedure, we
have to decide upon the following points which I am placing before
you in order of priority :—
(1) Selections of dam sites to be taken up first;
(2) Further detailed investigations as to the selected dam sites
before construction can begin ;
(3) The agency for such further preliminary investigations ;
(4) The agency for designing and construction of dams ;
(5) The creation of high grade administrative machinery to coordinate and push forward the vast amount of work, both
technical and administrative, that will have to be done
during the stages of investigations and construction that
are to follow ; and
(6) A series of surveys relating to the best utilisation of water
and power that will be eventually available in the developed
areas.
“I would like to emphasize the need for a quick decision on the
points relating to method and procedure. The project is no doubt
primarily for the establishment of safety and the development of a
PDF page 304
287
MULTI-PURPOSE DEVELOPMENT OF DAMODAR VALLEY
multi-purpose river basin project. But it cannot be forgotten
that the project is a post-war employment project. As the war
is now over on all fronts, we are faced with the problems of
peace one of which is to prevent unemployment which, with the
sudden cancellation and the reduction of war employment and
expenditure, is going to be one of the gravest problems in our
domestic economy.
Central Government’s Part
“From this point of view, the Damodar Valley Project is a matter
of grave urgency, and it would be a criminal folly not to come
to an early decision, without which it is not possible for us to
proceed further in the matter. I, therefore, hope and trust that,
with your cooperation, we should be able today to return with
our decisions fully and firmly made.
“ Before closing, let me tell you that the Government of India
is very keen, very earnest and is prepared to play its full part
in carrying through its project.
(1) The Government of India in conformity with their earlier
declarations recognise their responsibility for doing all that they
can to speed up the project on approved lines, and to this end
will endeavour to the best of their ability. Though the form of
the authority to carry out the project and the manner of setting
it up is yet to be defined, the original view of the Government
that such an authority should be set up remains unaltered.
(2) The Government of India is prepared to assume direct
responsibility for securing the staff and organisation necessary
to carry out all further preliminary investigation in such manner
as will facilitate and expedite construction with such assistance
as the two Provinces can render without any serious detriment
to their post-war development works. The Government of India,
however, realise the shortage of engineering manpower in Bengal
and will endeavour to find the necessary staff by drawing
upon the services, if found available, of a military unit and its
equipment to assist in preliminary investigation. This will avoid
drawing on the strained engineering resources of the Province at
a larger extent than is necessary and will secure a most rapid
supply of equipment.
(3) The Centre is prepared to advance, initially, the funds necessary
for the further preliminary investigations undertaken by them which
PDF page 305 (printed page 288)
288 DR. BABASAHEB AMBEDKAR : WRITINGS AND SPEECHES
are necessary for the main project of the understanding that
such preliminary expenses will be charged to the project if it
materialises and divided half and half between the Centre and
the Province if it does not materialise.
“There is only one thing which the Government of India
expects the Provinces to do. It expects the Provinces to bear in
mind the absolute necessity of ensuring that the benefits of the
project get ultimately right down to the grass roots, i.e. everyone
living in the Valley and some of those in the vicinity, all have
their share in the prosperity which the project should bring.
This, in my view, is essential, and it is for this reason that we
want the establishment of some agency early enough so that that
agency can set about planning at once in the manner in which
its essential and ultimate object can be secured.”
CONFERENCE DISCUSSIONS
The Conference decided to proceed rapidly with further
investigation and progress in regard to the Unified and Multipurpose Damodar Valley Development Project.
It was agreed that the scheme should provide the maximum
measure of flood protection that might be necessary against the
most favourable combination of natural circumstances.
Further investigation of possible dam sites on the Damodar
River would be necessary before starting actual construction,
and among the sites which required such investigation were
Maithon, Aiyar and Sonalapur. The Conference discussed the
technical aspects of the question and decided that the order of
priority of investigation should be, Maithon first, Aiyar second
and Sonalapur third ; and that the Central Technical Power Board
should prepare project reports for each of those dam sites—in
the case of Sonalapur dealing in particular with possible effects
on coal production.
Necessary Staff
The Central Government would try to secure staff, at
the earliest possible opportunity, for the further detailed
investigations required for such project reports. Meanwhile,
however, investigations should be carried on by such staff as
was immediately available.