224 DR. BABASAHEB AMBEDKAR : WRITINGS AND SPEECHES
The basis of the discussion was a note circulated by the
Central Government regarding the procedure for collecting
necessary information.
Suggestions made in this note required that the three
Governments should prepare an inventory of the facts and
figures available to each other. This inventory was to be
prepared in consultation with the Central Government’s
technical experts, and, if it did not disclose all the facts
required further information should be collected. The Central
Government’s technical experts could than prepare a preliminary
memorandum setting out the prospects for a co-ordinated
scheme for the multi-purpose development of the Damodar
Valley. The three Governments should then get together and
give the necessary instructions for framing a project to the
technical experts of the Central Government and the Provinces.
General Agreement
While there was general agreement on the question of making
the Damodar Scheme a multi-purpose project, representatives
of Bengal emphasised that the problem of controlling floods in
Damodar should be a primary concern. After some discussion,
it was agreed that investigations on the lines suggested by
the Central Government should start under Mr. Man Singh,
Special Engineer (Irrigation) with the Bengal Government.
The Central and Bihar Government would try to lend officers
to assist Mr. Man Singh in this investigation. Mr. A. Karim,
Deputy Chief Engineer, Irrigation Department, Bihar, would
remain in touch with Mr. Man Singh.
Earlier during the meeting Mr. H. C. Prior, Secretary,
Labour Department, Government of India, spoke about the
administrative side of the waterways problems and indicated
days and means by which the Centre could lay its part.
* * *
Among those who attended the Conference were the Hon’ble Mr.
B. P. Paine, Minister for Communications and Public Works, Bengal
Government, Mr. B. Sarkar, I.C.S., Secretary, Communications
and Public Works Department. Mr. B. L. Subarrwal, Mr. J.
F. Russel, Chief Engineer, Bengal, Mr. Man Singh, Special
PDF page 242
225
DAMODAR VALLEY SCHEME CALCUTTA CONFERENCE
Engineer (Irrigation), Mr. N. K. Bose, Director, River Research
Institute. Mr. N. Dar, Secretary, Post-War Reconstruction
Committee, Mr. H. M. Ishaque, Development Commissioner and
Mr. A. Karim, Deputy Chief Engineer, Irrigation Department,
represented the Government of Bihar. Mr. H. M. Mathews,
Chairman, Central Technical Power Board, Mr. W. L. Voorduin,
Hydro-Electric Member of the Board and Mr. D. L. Mazumdar
were also present to represent the Central Government.
zz
PDF page 243
40
* Post-war Electric Power Development
A schedule of heavy power equipment required by India
as soon as possible after the cessation of hostilities has been
prepared and steps have been taken to reserve for India
the necessary manufacturing capacity, said the Honourable
Dr. B. R. Ambedkar, Labour Member, Government of India,
in his address to the second meeting of the Policy Committee
on “Public Works and Electric Power” held in New Delhi on
February 2.
Here is the full text of Dr. Ambedkar’s speech :
I should like to begin by extending to all the representatives,
old and new, present at this meeting a most hearty welcome.
I say old and new because we have on our Committee new
members who were not on the Committee when we met
last. They are the nominees of the Federation of Electrical
Undertakings in India and of the Indian Trade Union Congress.
Electrical undertakings and organised labour are both vitally
concerned in the future of electrical development in India and
whatever they may have to say about the subject must receive
due consideration in any decision that may be arrived at. I
am sorry that an omission to have them with us should have
occurred last time. I apologise for it, for it was indeed a very
serious omission. I am sure we are all very glad to have them
with us today and will be looking forward to their contribution
to the discussion of the subject we have before us.
Power Engineers’ Conference
I believe it would be of some advantage if I were to begin the few
observations I have to make as Chairman by referring to what has been
*Indian Information, February 15, 1945, pp. 235-41.
PDF page 244
227
POST-WAR ELECTRIC POWER DEVELOPMENT
done by the Government of India in furtherance of the postwar planning for electrical development since the Committee
last met on October 25, 1943, as most of you may have no
knowledge about it. Soon after the last meeting of this Policy
Committee, Mr. Mathews, the Electrical Commissioner with
the Government of India, with the approval of Government,
called together a Conference of leading power engineers in
the country, both official and non-official, to consider postwar
electric power development. The first thing the Conference
did was to prepare a schedule of the heavy power equipment
required by India for electric development immediately
after the war. In addition to this the Conference passed
certain resolutions all of which, to use the language
of the report, “represented the unanimous conclusion
of their studies, investigations and discussion.” These
resolutions fell under four heads :—
(1) Under the first come recommendations which set out
some general and specific suggestions to the Provinces
and States to be observed by them in regard to electrical
development within their jurisdiction.
(2) Under the second were grouped those which concerned
the appointment of the Technical Power Board.
(3) Under third come those related to certain prospective
power developments considered by the Conference to the
prima facie worth investigation without dalay.
(4) Under the fourth head were placed those which relate to
railway electrification, manufacture of synthetic fertilisers
and rural electrification.
As the members of the Conference said in the letter
accomanying their findings, “this is the first occasion on which
the power development programme has been reviewed as a
coordinated whole and that the presence of engineers whose
experience covers in the aggregate the varied conditions of the
whole of India, has introduced an extremely valuable element
in co-ordinating regional needs.”
Heavy Power Equipment
I am sure you will agree that we owe the Conference a great debt for
unfolding to us the prospective electric power development for the
PDF page 245 (printed page 228)
228 DR. BABASAHEB AMBEDKAR : WRITINGS AND SPEECHES
whole of India in the period immediately succeeding the cessation
of hostilities in such clear cut manner. The Conference asked the
Government of India to take appropriate action on the several
recommendation made by them. The two recommendations in
regard to which action lay with the Government have been
already put into effect. They relate to the securing of equipment
and the establishment of the Technical Power Board.
A schedule of heavy power equipment required by India
as soon as possible after the cessation of hostilities has been
prepared and steps have been taken to reserve for India the
necessary manufacturing capacity. The total capacity reserved
come to over 850 megawatts, at an estimated cost of Rs. 50 crores
approximately. The aggregate of new capacity represented by
these schedules comes to nearly 65 per cent of India’s existing
installed capacity. A more detailed inquiry might show that
our requirements for equipment are larger than what has been
booked for. But as it was impossible to delay the matter without
putting India’s interest in grave jeopardy, we had to take action
immediately on such data as could be collected within the limited
time that was available to us.
Technical Power Board
As you must have noticed from the Press Note issued on
November 8, 1944, the Government of India has constituted
a Technical Power Board. Besides the Chairman, the Board
will initially have two full-time members and three part-time
members. The Government of India has appointed Mr. Mathews,
Electrical Commissioner with the Government of India, as the
Chairman and has obtained the services of Mr. W. L. Voorduin
from the United Stales of America as another member of the
Board. Before he came to India, Mr. Voorduin was employed
as a Project Officer of the Tennessee Valley Authority. It is
proposed to have a third member to be called the Utilisation
Member. Effort is being made to recruit a suitable Engineer
who is conversant with Utilisation. These appointments of
high level experts will assure you how very anxious the
Government of India is to make the Board a strong technical
organisation designed to collect ideas, conduct surveys and
prepare schemes for the electrical development in consultation
with Provincial and State Governments. I have referred